Historical Perspective
Organization
Route Map
Departments
Passenger Information
Tourist Information
Picture Gallery
Extra Curriculum
Complaints/suggestions
News/Messages
Contact Us
FAQ
RTI
Disclaimer
 
 
 
 
Electrical/TRD
 
 

Sr.DEE (TRD)/ Danapur is overall in charge of all activities of Traction Distribution over the Division with the assistance of DEE (TRD)/ Danapur, AEE (TRD)/ Danapur and  AEE (TRD)/ Mokama, AEE/TRD at Buxar.

 
OHE near Patna Jn.
 
 
  1. TRACK ELECTRIFIED: -RKM-495, ETKM-1181.2
  2.  O8 OHE DEPOTs located at JAJ, MKA, BKP, DNR, ARA, BXR, DLN, JHD.
  3. 09 Traction Sub-Stations(TSS) located at JAJ, LKR, MKA, KOO, DNR, ARA, DURE, ZNA, JHD‘C’.
  4. 10 Sectioning  Posts (SP)  located at JMU, BRYA, RH, PNC, BTA, BYN, GMR, KCA, PPN, CKH.
  5. 25  Sub Sectioning  Posts(SP)  located at GHR, MNP, KEU, MKB, HTZ,  GHX, PHK, BKP, FUT, PNBE-I, SDE, KUA, KYA, TWG, BXR, CSA, BWH, DLN, DHA, SLD, PNBE-II, NWD, NDU, THA, BELA
  6. 01 REMOTE CONTROL CENTRE at Danapur.
  7. The TRD maintenance has been tightened. Many action taken for OHE reliability ;

                                            AOH of OHE * 9 Ton defective batch replacement * RE POH * Bonds provided * Tree trimming * Tree cut from 0 level / 5 m level * ST/ BT Insulator replacement * Insulated tape/ Insulated Catenary wire provided on vulnerable locations  to avoid frequent failure.

    • DEPOTWISE DISTRIBUTION OF JURISDICTION:
 

LOCATION

DEPOT
JURISDICTION
SECTION
RKM
TKM
366 JAJ Km 364/11-12 to 424/3-4 (JAJ incl.) to (LKR incl.)
61
147.50
454 MKA M/L – Km. 424/3-4 to 459/11-12 (LKR excl.) to (MOR excl.)
34
98
Link –Km.443/01-17/17 to 449/21- 03/16 (TAL-RDUM-BJU)
21
76
498 BKP Km.459/11-12 to 520/25-26. (MOR incl.) to (FUT excl.)
61
129
553 DNR Km.520/25-26

to   569/11-12

&

Km- 01 to 11/5

(FUT incl.) to (BTA excl.)

&

(PNBE / SSP-II  to PPN/ SP-( PPN- excl.)

49 
 

11

192.271 
 

25

592 ARA Km.569/11-12 to 629/11-12. (BTA incl.) to (RPR incl.)
60
132.5
661 BXR Km.629/11-12 to 690/01-02 (RPR excl.) to (BWH excl.)
60
132.8
697 DLN Km.690/01-02 to 748/01-02. (BWH incl.) to (KCA incl.)
59
125
 
TOWER WAGON AT VARIOUS DEPOTS :
 
Tower

Wagon

No.

Type

of  Tower

Wagon

DEPOT RKM TKM
866 4-Wheeler

(Mark-III)

BXR 60 132.8
6512 8-Wheeler, SAN DNR 60 217.271
847 4-Wheeler

(Mark-III)

DLN 59 125
3485 8-Wheeler,

BEML

DNR 60 217.271
868 4Wheeler

(Mark-IV)

BKP 61 129
785 4-Wheeler

(Mark-IV)

MKA 55 174
RU-

02902

8-Wheeler

ICF

JAJ 61 147.50
864 4-Wheeler

(Mark-III)

JHD 79 123
781 4-Wheeler

(Mark-III)

ARA 55 178
 
To Download relevant documents of this department, please
 
Copyright © 2009 Danapur Division. All Rights Reserved.
Website Designed By IT Spark Solutions