Historical Perspective
Organization
Route Map
Departments
Passenger Information
Tourist Information
Picture Gallery
Extra Curriculum
Complaints/suggestions
News/Messages
Contact Us
FAQ
RTI
Disclaimer
 
 
 
 
Operating
 

    Sr.DOM/ Danapur is overall in charge of management of operations of all Passenger and goods trains over the Division with the assistance of Sr.DOM (G)/ Danapur, DOM/ Danapur, AOM / Danapur and Area manager/ Patna.

Small station in branch line
    • Salient Features of this department-    
 
    • Improvement in terminal throughput and turnaround-
Item 2007-08 Target 2008-09 2008-09 % variation with

2007-08

% variation Target
Wagon Turn Round 1.18 1.15 1.18 +0.0 + 2.6
Wagon Interchange (8-Wheeler) 1378 1600 1623 + 17.7 + 1.4
Average Terminal detention

to rake (hrs)

29 18 24 - 17.2 + 33.3
 

      Projected 2009-10: Wagon Turn Round - 1.10, Wagon interchange – 1675 and Average Terminal detention to rake (hrs) – 22.

    • performance  regarding originating  loading
 
Item Achievement

07-08

Achievement

08-09

% variation with 07-08
Originating Loading (in day) (8-Wheeler) 21 29 + 38
Tonnage 0.514 0.660 + 28
 
Punctuality Performance:
Item 2007-08 Target

2008-09

2008-09 Mar’08 to Dec’08 Jan’09 to Mar’09

( i.e. after COIS)

M/Express 94.4% 95.5% 88.5% 94.4% 70.5%
Passenger 96.4% 97.0% 91.2% 97.5% 72.5%
 
    • Computerization of Control Rooms.

      All sectional control boards have been computerized and computerized control charting along with ICMS and COIS is operational from July, 2008. 

    • Review chart of comparative achievements- % Comparison from previous year (cumulative)
 
To Download relevant documents of this department, please
 
Copyright © 2009 Danapur Division. All Rights Reserved.
Website Designed By IT Spark Solutions